Track works – Ryen Base
Client:
Sporveien AS
Main tasks:
- Replacement of 5x 1:7 turnouts
- Complete mass replacement
- New cable channels (cable ducts)
- New contact rail (third rail)
- Thermit welding and neutralization
About:
The biggest challenge with Ryen Base was the access possibilities to the construction site. The only possibility was through the track, as the facility was sandwiched between buildings, rock cuttings and the motorway. We solved the task of offering a robust plan, where we scored big points for the logistics solutions. We staffed the project with a logistics coordinator with extensive experience, which was the key to handing over the project on time.
Construction Time:
Summer 2020