Test track – Straumsnes
Client:
Bane NOR SF
Main tasks:
- 600meters of new tracks for a heavy haul testing project.
About:
A new test track of approximately 600 meters was established. The reason is to possibly increase the axle load on the Ofot line.
This was a job that was carried out in 2 breaks.
Construction Time:
August – September 2022