Test track – Straumsnes

Client:

Bane NOR SF

Main tasks:

  • 600meters of new tracks for a heavy haul testing project.

About:

A new test track of approximately 600 meters was established. The reason is to possibly increase the axle load on the Ofot line.
This was a job that was carried out in 2 breaks.

Construction Time:

August – September 2022