Railreplacement – Ofotbanen 2021 – 2022

Client:

Bane NOR SF

Main tasks:

  • Railreplacement of total 19.000meters of rails.
  • Sleeper replacement of total 6000sleepers
  • Trackadjustment and tamping.
  • Thermit welding and neutralization

About:

Railreplacement in Ofotbanen, a heavy haul track that consists with one of the heaviest axel load in the world.

Construction Time:

Summer 2021 – 2022